For shops. Runs on your own computer. Your customers' drawings are never uploaded.
A request for quote lands with a 3D file and a drawing, due Friday. Quote high and the job goes elsewhere; quote low and every part loses money for a year. Diogenes plans the job the way your shop would make it and builds the quote one step at a time.
Click to enlarge
Start a new should-cost, load the customer's 3D file, then their drawing. Diogenes reads the drawing onto the part: the material, the tightest tolerance, the surface finishes, the GD&T frames and the heat treatment, and when it is done.
Evaluate shows every process that can make the shaft. Create the part and its should-cost is on the page. Open the Lantern and watch the mill-turn cut it, operation by operation, on the machine the cost was worked out on.
Load the 3D file and the drawing. Diogenes reads the material, the tolerances and finishes, the GD&T frames and the notes, and builds the route from them. The g6 journals bring in grinding. The heat treat goes after machining because note 4 says so. The journals are ground after hardening, so the grind takes out the heat-treat bow and nothing needs straightening. Each GD&T frame goes to the gauge that checks it. Note 9 brings in the rust-preventive oil. That is $11.82 a part, with nothing typed.
Then add what your shop does that no drawing says. Here, a magnetic-particle crack test after hardening and the shop's own packing, each from the + between two steps in Part & process settings, with its cost shown before it goes in. The quote moves to $13.04: the two steps, plus the SG&A, profit and finished-stock holding they carry.
The same part costs a very different amount depending on how the shop runs. Set up your shop in Diogenes: your machines, your rates, how you staff them and how many shifts you run, and the quote is yours. You also see exactly where you stand against an efficient shop.
The aluminium housing from the home page: the same part, cuts and material each time. The staffing is all that changes.
| The same housing, made by | Shop rate | Per part |
|---|---|---|
| A robot-loaded mill on two shifts | $41/hr | $18.96 |
| One operator at each machine, two shifts | $83/hr | $31.03 |
| One operator at each machine, one shift | $92/hr | $33.32 |
More buyers now arrive with their own should-cost. Open the line they question and agree it against the same sources, step by step.
Why is it ground? Turn it.Open the journal: a g6 fit, an Ra 0.8 finish and a cylindricity of 0.008 mm, and the grinding they bring in, with its time and its rate.
That much inspection?Open it: runout on a dial indicator between centres, cylindricity on a form tester, keyway symmetry with a gauge block, each timed from a standard-time card. No CMM: nothing on this drawing needs one.
Your cycle is too long.See the cycle split into roughing, finishing, the keyway, insert changes and the bar feed.
Your rate is too high.See what is inside the hourly rate: the machine, the operator, the floor space, the energy and the overhead.
Heat treat can't cost that much.See the furnace, how many shafts fit in a load, the hardness check on each load and the freight to and from the heat treater.
Steel came down.See the steel price it used, the index it came from and its date. Re-cost on this month's price.
A quote built from past jobs needs a past job. Diogenes builds it from how the part is made, so a part you have never made is quoted on the same footing as a repeat job.
Metal, wages and energy update from public sources. Re-cost one part, or a whole bill of materials, in one step.
Every estimate exports to Excel and PDF, line by line, with the source of every number.
Installed on your own computer. It goes online just for public rate updates. No drawing is ever uploaded.
A 30-minute video call. Bring a drawing to show on screen, or describe the part in a few words. Nothing needs to be sent to me.
The sample is the housing from the home page, as the app exports it. Or write to me directly: [email protected]
I can tear down your product, cost every part in Diogenes and hand you the report: what each part should cost, how it is made, where its price comes from, and which suppliers are furthest from it. Then I help you build the negotiation plan: which parts to take up and in what order, what to ask each supplier, and the numbers to bring to the table.
Ask about a teardown and report